To the central content area

111-Year Chiayi City National Water Environment Clean River Plan

Absrtact
Jijia Engineering Technology Co., Ltd. assists the Environmental Protection Bureau of the Chiayi City Government (hereinafter referred to as the Environmental Protection Bureau) to implement the "111-Year Chiayi City National Water Environment Clean River Plan" (hereinafter referred to as this plan), and the implementation period starts from January 111 From the 11th to November 30th, 2011, the planned funding is NT$1.75 million. In view of the fact that cleaning up river surface garbage is also a key item promoted by the city's municipal government, and in line with the work priorities of the "National Water Environment Improvement Plan", the Chiayi City Government plans to implement the river surface garbage removal plan for the municipal drainage of Chiayi City. Therefore, it will be studied It is planned to propose the "111-Year Chiayi City National Water Environment and Clean River Plan" in order to effectively handle the waste removal operation of Chiayi City's municipal drainage and prevent the city's drainage waste from flowing into adjacent river basins (Puzixi River Basin and Bazhangxi River Basin) through drainage channels. Affect the environmental landscape and water quality of river basins. The statistical period of this report is from January 11, 2011 to November 30, 2011. The summary of the work content and implementation results is as follows. 1. Garbage inspection operations in surface waters: 2 hot spots of garbage inspections in surface waters (20 places) were completed every month, and a total of 409 times were completed. 2. Garbage removal in surface waters: 55.61 tons were removed. 3. Reporting of results of river waste: This plan submits monthly work reports according to regulations before the 10th of each month, and submits a total of 11 times. 4. Cooperate with the Environmental Protection Agency in the assessment of ground water waste removal (1). Carry out inspections on surface water bodies every month, and carry out garbage removal operations in different surface water bodies. Before the 10th of the next month, fill in the "Surface Water Body Garbage Removal Management System" online, and report a total of 11 times. (2). Carry out designated garbage sorting at least once a month, a total of 11 times. (3). The pre-release or announcement information and implementation results of Lijingxi activities are reported in the "Surface Water Body Garbage Intervention Management System" for 1 session.
Keyword
clean river
Open
top